View
0
Download
0
Embed Size (px)
Critical Control Points (CCPs)#
Notes: 1. Single EZ Heaters are shown. Possible arrangements include EZ Heaters in parallel for improved turndown and redundancy. 2. Heaters are shown in-line. For applications with rapidly varying �ow and tight temperature requirements, a recirculation loop and/or buffering tank is recommended.
Digester
City Water Supply
Waste Heat Reclaim
Steam Supply
Main Water Tank
Return Water from Plant 80-120˚F; generally a small % of out�ow
Plant System Using EZ Heaters
Main Water Loop 900-2000 GPM; 140˚F
General Washdown and Cleaning Varying �ow rates 140˚F
Sanitizing Varying �ow rates 180˚F
1
2
3
4
5
6
10
11
12
13
14
15
7
8
9
16
Live Cattle
Stun
Bleeding
Hide-on Carcass Wash Hide Removal
Head and Hock Removal Pre-viscera Wash and Sanitization Viscera
Inspection
Offal Wash
Tripe Wash
Wash and Sanitization
Wrapped and Freezed
Utensil Sanitization
Processing
Packaging and Shipping
17 Digester heating
Waste Treatment
© H YDR
O-T HER
MA L
COR POR
ATIO N
© 2010 Hydro-Thermal Corporation MP-201
MEAT PROCESSING INDUSTRY
